logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

Davis Water Treatment Plant Flocculator Improvements Project – Austin, Texas

img
img

Project Description:

Project scope was the replacement of existing Flocculator Basin Drive Shafts and Bearing in order to improve the performance of the equipment and reduce the maintenance requirements. Structural design included detailing of new solid shafts, retrofit of existing anchorages of shaft support brackets and replacement of existing ramp at PAC buildings

Services Provided:

Guerra Engineering provided complete structural engineering design and construction administration services.

Owner:City of Austin

Contact Person:James King

Date Completed:2009

Construction Cost:$3,700,000

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering