logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

Davis Water Treatment Plant – General Process Improvements – Austin, Texas

img

Project Description:

Project scope was the replacement and rehabilitation of existing process structures. The structural engineering design included new larger sludge pump boxes at sedimentation basins 1-6, addition of new gate valve operator platforms, replacement of roof access doors with lift-out panels with integral access hatches, new SHMP storage pad with access catwalks, revisions to existing Fluoride Area, access improvements for Raw Water Fault.

Services Provided:

Guerra Engineering provided complete structural engineering design and construction administration services.

Owner:City of Austin

Contact Person:James King

Date Completed:2009

Construction Cost:$13,700,000

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering