Davis Water Treatment Plant Treated Water Discharge System – First Priority Improvements – Austin, Texas

Owner: City of Austin
Contact Person: Denny Givens
Current Phone Number: 512-326-5659
Date Completed: 2012
Final Cost: $2,281,000
Project Description:

The project addressed a list of critical rehabilitation work that was required to extend the life of the existing system until a new pump station could be constructed.  The structural work included the addition of two new permanent bulkheads inside of the existing Filtered Water Channel and the addition of three new access hatches to the roof slab over the Filtered Water Channel.  A temporary, removable steel bulkhead system was required to allow the Plant to remain partially in-service during this construction. The project also included the rehabilitation of ten existing valve vaults, the reconstruction and enlargement of another existing vault, the addition of a new slide gate vault structure, and repairs to various leaks in existing walls at the Filter Pipe Gallery and at the Flocculator Gallery.


Services Provided:

Jose I. Guerra, Inc. provided complete structural engineering design services including preparation of contract documents and construction administration services


Slideshow (Click images below to view)