logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

LCRA Lake Plant Pump Station – Eagle Lake, Texas

img

Project Description:

Rehabilitation of an 80 year old pump station to provide 200,000 gpm of Colorado River water to the Eagle Lake area rice farmers. The project included the stabilization of walls of the existing suction well, and a new pump station structure and new out flow structure.

Services Provided:

Guerra Engineering provided complete structural engineering design services, including design of the intake structure, the pump station foundation, the suction well stabilization system and the out flow structure basin.

Owner:Lower Colorado River Authority (LCRA)

Contact Person:Jim Dower

Date Completed:April 2005

Construction Cost:$4,500,000

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering