logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

Texas Facility Commission – North Campus Phase II (design) – Austin, Texas

img

Project Description:

The North Campus Phase II is located at the existing John H. Winters campus. The project design was for a new seven-story, 302K GSF office building renovation with seven-level parking structure with appx 1550 parking spaces and utility connections to the existing Central Utility Plant.
Project will not move to the construction phase.

Services Provided:

Guerra Engineering provided Mechanical, Electrical, Plumbing and Fire Protection engineering design services.

Owner:Texas Facilities Commission

Contact Person:Perkins & Will | Wendy Lamb

Date Completed:Engineering Design Complete 2023

Construction Cost:$175M (est.)

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering