logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

Walnut Creek Wastewater Treatment Plant Primary Clarifier & Flow Equal Basin Rehabilitation – Austin, Texas

img
img

Project Description:

The PER Phase was completed in September 2021. The evaluation of the existing structures to develop a TM for a PER. The structures evaluated were the Primary Clarifier & Flow Equalization Basins from the original contract in 1974 and the first major expansion in 1986. The evaluation included the condition of the concrete in the walls and the roof of the structures. The rehabilitation includes significant modifications to the existing roof, walls and basins with troughs. The design following the PER findings is now underway.

Services Provided:

Guerra Engineering providing complete structural engineering design and construction administration services.

Owner:City of Austin

Contact Person:Black and Veatch | Alex Kuzovkov

Date Completed:March 2025 (est.)

Construction Cost:$35M (est.)

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering