logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

AISD Wooten Elementary School – Austin, Texas

img
img

Project Description:

As part of the 2022 Bond, Wooten Elementary School will receive a full modernization of the existing campus at its current location. The new building will feature flexible learning spaces to support a variety of learning styles, designed by and for the Wooten community. Project design will begin spring 2023 and the modernized campus is anticipated to open for the start of the spring 2026 semester.

Services Provided:

Guerra Engineering provided complete MEP/FP engineering design and construction administration services.

Owner:AISD

Contact Person:Kirksey

General Contractor:Flintco

Date Completed:January 2026

Construction Cost:$40M

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering