logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

Davis Water Treatment Plant Power Distribution Upgrade (PDU) – Austin, Texas

img

Project Description:

The project scope was for the upgrades and renovations to the existing power distribution system for the plant.
This project included the addition of a new electrical substation building. The building had a 5,000 SF footprint, with a 25-tall above ground building made of load-bearing CMU walls and steel roof trusses and a 14-ft deep concrete basement structures. The building housed the equipment pads
for eight new transformers at four specific zones.

Services Provided:

Guerra Engineering provided complete structural engineering design services including
preparation of contract documents and construction administration services

Owner:City of Austin

Contact Person:Harutunian Engineering, Inc.

Date Completed:December 2022

Construction Cost:$25M

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2026  Jose I. Guerra, Inc. dba Guerra Engineering