Projects / Water / Industrial

Davis Water Treatment Plant Flocculator Improvements Project – Austin, Texas

Owner: City of Austin
Contact Person: James King
Date Completed: 2009
Construction Cost: $3,700,000
Project Description:

Project scope  was the replacement of existing Flocculator Basin Drive Shafts and Bearing in order to improve the performance of the equipment and reduce the maintenance requirements. Structural design included detailing of new solid shafts, retrofit of existing anchorages of shaft support brackets and replacement of existing ramp at PAC buildings

 

Services Provided:

Jose I. Guerra Inc. provided complete structural engineering design and construction administration services.

Slideshow (Click images below to view)