Davis Water Treatment Plant Power Distribution Upgrade (PDU) – Austin, Texas
Project Description:
The project scope was for the upgrades and renovations to the existing power distribution system for the plant.
This project included the addition of a new electrical substation building. The building had a 5,000 SF footprint, with a 25-tall above ground building made of load-bearing CMU walls and steel roof trusses and a 14-ft deep concrete basement structures. The building housed the equipment pads
for eight new transformers at four specific zones.
Services Provided:
Guerra Engineering provided complete structural engineering design services including
preparation of contract documents and construction administration services
Owner:City of Austin
Contact Person:Harutunian Engineering, Inc.
Date Completed:December 2022
Construction Cost:$25M