Davis Water Treatment Plant – General Process Improvements – Austin, Texas

Owner: City of Austin
Contact Person: James King
Date Completed: 2009
Construction Cost: $13,700,000
Project Description:

Project scope was the replacement and rehabilitation of existing process structures. The structural engineering design included new larger sludge pump boxes at sedimentation basins 1-6, addition of new gate valve operator platforms, replacement of roof access doors with lift-out panels with integral access hatches, new SHMP storage pad with access catwalks, revisions to existing Fluoride Area, access improvements for Raw Water Fault.

 

Services Provided:

Jose I. Guerra Inc. provided complete structural engineering design and construction administration services.

 