Projects / Water / Industrial
Davis Water Treatment Plant – Treated Water Discharge System Improvements – New MSPS – Austin, Texas
Jose I. Guerra, Inc. provided the design phase to construction phase services to the Medium Service Pump Station of Davis Water Treatment Plant Treated Water Discharge System. The overall construction cost is $43 million for a water treatment capacity of 60 MGD (expandable to 120 MDG). The structure, is approximately 155ft long x 80ft wide x 24ft deep into the ground. The pump station also includes a 2-story superstructure above the pipe gallery that houses the electrical room and mechanical room. Our firm utilized our knowledge of the existing Davis Water Treatment Plant and provided valuable coordination advice to the design team.
Provided complete structural engineering design services including preparation of all structural contract
documents and construction administration and mechanical and controls design support during construction administration phase.