Project Description:
Rehabilitation of an 80 year old pump station to provide 200,000 gpm of Colorado River water to the Eagle Lake area rice farmers. The project included the stabilization of walls of the existing suction well, and a new pump station structure and new out flow structure.
Services Provided:
Jose I. Guerra, Inc. provided complete structural engineering design services, including design of the intake structure, the pump station foundation, the suction well stabilization system and the out flow structure basin.