SAISD – Mechanical Upgrades at Estrada Achievement Center – San Antonio, Texas
Project Description:
Project scope included select mechanical system replacements and a complete controls system replacement throughout the entire school. The existing control system was being systematically removed and replaced for each piece of equipment to facilitate a new open protocol building automation system integrated into the SAISD network.
Services Provided:
Guerra Engineering was the Prime Firm and provided complete mechanical, electrical, and plumbing engineering design and construction administration services.
Owner:San Antonio ISD
Contact Person:Victor Valdez, AIA
Date Completed:July 2022
Construction Cost:$350,000