logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!
logo
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
    • Higher Education
    • Municipal
    • Water / Industrial
    • Aviation
    • K-12 Education
    • Commercial
    • Faith Based
  • About Us
    • Leadership
    • Meet the Team
    • History
  • Contact
Come grow with us!

Southern Walnut Creek Hike and Bike Trail Bridges – Austin, Texas

img
img

Project Description:

The Southern Walnut Creek Trail is a planned 7.3 mile trail along the Walnut Creek Greenbelt. The trail is Austin’s longest paved non-motor-vehicular pathway. The entire trail is constructed of 10-foot-wide concrete sidewalks with 2-foot-wide grass shoulders. The project includes the construction of 5 bridges, 3 elevated boardwalks, signage, benches, parking lots at trailheads and access to other amenities. The trail primarily follows Walnut Creek from Govalle Park (East Austin) to Walter E. Long Park (North Austin). Guerra Engineering provided the design for a elevated boardwalk as a unique solution to the surrounding terrain as it was potentially unstable.

Services Provided:

Guerra Engineering provided complete structural engineering design and construction administration services.

Awards / Recognition:

Austin Chronicle 2014 Annual Best of Austin Awards – Best New Path Through the Woods Award

Owner:City of Austin

Contact Person:Mary Mazzei | Halff Associates, Inc.

Date Completed:February 2014

Construction Cost:$8,500,000

Guerra Engineering
img

Contact Info

Austin Office:

(512) 445-2090

1701 Directors Boulevard
Suite 400
Austin, Texas 78744
San Antonio Office:

(210) 802-0922

711 Navarro St.
Suite 215
San Antonio, Texas 78205

Navigation

  • Home
  • About Us
  • Capabilities
    • Civil
    • Structural
    • MEPFP
  • Projects
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions

© Copyrights 2025  Jose I. Guerra, Inc. dba Guerra Engineering